Stage C - Concept
Development of the design brief in sketches, models or
visualisation as concept proposals.
Stage D - Design Development
Development of the concept into detailed designs suitable for
planning application submission.
Stage E - Technical Design
Preparation of technical designs and specifications with
particular attention given to the material choice, workmanship
and construction in consideration of the statutory standards
and construction safety.
Stage F - Production Information
Preparation of working drawings and other details for
construction and tendering requirements, including building
regulation’s documents preparation and submission.
Stage H - L Tender to Practical Completion
Identification of suitable contractor for the work, site
handover and administration of the building contract to
completion.
|